-
Summary and outlook
Dr. Paul ThiemeDone
-
I 4.0 implementations in Bosch plants
Efe Kutluhan KaplanDone
-
Coffee break
Done
-
Integration into the project plan - what does this look like?
Thormod SigleDone
-
From Manufacturing Execution System (MES) to Smart Manufacturing Operation Management (MOM)
Michael OberleDone
-
Lunch break
Done
-
What are the success factors for change and how do I find out where we should take action?
Thormod SigleDone
-
Welcome at Bosch in Ulm: Why change management?
Thormod SigleDone
-
Introduction to the 2nd day
Dr. Paul ThiemeDone
-
How do I do an Associate Impact Analysis?
Thormod SigleDone
Connectivity in I 4.0
17/06/2024, 08:45
-
17/06/2024, 09:30
(Eastern Daylight Time)
(45 minutes)
Frank Markert
Senior Trainer Automation Engineering Produkt Qualität
at BOSCH CONNECTED INDUSTRY